Figure 1 Pre-governance

Figure 2 After governance
Project
A new 6,000 hp crushing line was installed at the 2 Mt/y scrap-processing project in Meng'erzhuang. The main drive ran at 105-120 dB(A), seriously affecting operators inside the workshop and in the control room. An acoustic enclosure around the main drive brought levels within the national standard and industry requirements.
Discuss a similar project
Figure 1 Pre-governance

Figure 2 After governance
Your project could be next